RightChain Lots | Lot Size Optimization
SIMPLIFICATION
Setup Elimination (Dedicated Lines) Focused Factories and Lines
OPTIMIZATION
PRODUCTION CHANGEOVER SETUP COST REDUCTION
Sequence Jobs to Minimize Changeover Times Schedule in Off-Peak Periods EXECUTION Minimize Brands of Machinery vs. Low-Cost Bidder Parallel Processing (pit crews)
Everything Ready (Toyota) Point-of-Use, Special Tooling
ORGANIZATION
Dedicated Personnel Practice
Made with FlippingBook - Online catalogs